Status Needs review
Categories Structural
Created by Guest
Created on Nov 24, 2026

Steel to Extend from Placement Point.

Piles are typically placed in models from cutoff elevations. When placing Piles from End 2 the length should be constrained by the placement point. If the length changes the pile should extend or shorten keeping the placement point (End 2) at the top of pile the same. Columns already do this and keep the End 1 the same when the length is change. It should work the same as columns with the constrained point being the top rather than the bottom.

How frequently will feature be used? Once a week
How much time will you save? The time that would be save is in the editing. WIth this change the edits can be done in the schedules tool. This could save several hours per project.
Other Industry Power Generation