Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

My ideas: OpenBuildings Speedikon

Showing 6 of 247

The elements in the 2D representation should all be at the same Z height

English: The Z heights of the vertical elements (Objekt über Polygon) are incorrect. They are not at the Z-height of the 2D elements of the model graphic, but are always stored at the Z value of the height reference (3D height) of the object. The ...
4 days ago in OpenBuildings Speedikon 0 Needs review

"element ID..." drawing filter command to display additional attributes

It should be possible to use the “element ID...” drawing filter command to display additional attributes, not only the object ID, but also the floor and construction phase number, in order to be able to uniquely identify objects. This is particula...
9 days ago in OpenBuildings Speedikon 0 Needs review

Allow batch mode without GUI

As per the manual (OpenBuildings Speedikon CONNECT Edition Update 4.2) , the export of IFC files can be batch processed by creating a job.lst file in PROJECT\des\bat\COMPUTERNAME\ife\job.ptk and then running speedm.exe "-mod" "design" "-prj" "proj...
12 months ago in OpenBuildings Speedikon 2 Future consideration

Individuell erzeugte Bauteile mit dem Zeichnungsfilter bearbeiten

Individuell erzeugte Bauteile mit dem Zeichnungsfilter bearbeiten. Individuell erzeugte Bauteile werden für den Unternehmensstandard benötigt. Die nachträgliche Anpassung im Zeichnungsfilter ist erforderlich und erleichtert die tägliche Arbeit er...
11 months ago in OpenBuildings Speedikon 0 Future consideration

Performance information in ProjectEditor

Add thermal transmittance (Wärmedämmwert) and sound reduction (Schalldämm-Maß) as a column that can be edited to the following elements listed in Project Editor: Walls: single, compound, tilted, custom Openings: doors, windows, facade element...
over 2 years ago in OpenBuildings Speedikon 0 Future consideration

New data for spaces: Net Volume

At the moment we find two different data for areas: net area and gross area. However, there is only one volume available that can be shared in plans and spreadsheets: the gross volume, calculated as gross area * room height. In order to have an ov...
about 1 year ago in OpenBuildings Speedikon 2 Future consideration